We can help! Call today (888) 510-3623 or (513)-533-7070
Call for Price 513-533-7070
The Rail and Under Rail Gauging & Alignment Tool
Rail Gauging And Alignment Tool:
Built tough to withstand the railroad’s tough environment. Works in turnouts and tangent track. (Push or Pull) Safer and more efficient than a lining bar or track jacks. Allows employee to move rail or track components easily to exact location, then holds until fasteners are applied. Works great with timber turnouts, concrete, or steel.
Essential Tool: For Large or Small gangs. Please advise if ordering for track other than 56’1/2″. (Shipping and Handling not included in price)
Under Rail Gauging And Alignment Tool:
This tool is built tough to withstand the railroad’s tough working environment.
Tool is designed to work in turnouts and tangent track giving employees the ability to push or pull rail on component parts. Safer and more efficient than a lining bar or track jacks. Allows employee to move rail or track components easily to exact location, then holds until fasteners are applied. Works great with timber, concrete, or steel turnouts. Preferred alignment tool by many as head of rail canting compensation need not be used as with a top of rail alignment tool.
Essential Tool: For Large or Small gangs. INSULATED Insulated Alignment Tools. Built for daily railroad use:
Tough, minimum weakening due to insulation. Easily replaceable insulating coupler.
Railroad Tools and Solutions has recognized weakness in other versions of insulated rail gauging tools. With this thought in mind, a tough insulated tool was built.
Insulated, Non-Insulated
Top of Rail, Under Rail
Aluminum, Steel